Today we present a project carried out in 2022 for the client Excavaciones Cáceres. This is the assembly of a customised container that houses a generator set inside and is divided into two sections.

The first section houses the Agresa generator set and the second can be used as an office or changing room. This container is not mobile, but is designed to remain in a fixed location.

instalación grupo electrógeno en el túnel Renfe
instalación grupo electrógeno en el túnel Renfe

The dimensions of the generator set section are very small and the rear of the generator set cannot be accessed from the sides, so a ladder has been installed to access the other section if necessary. The ladder is stored on two brackets installed on the left door of the container. Just enough space has been left behind the equipment to allow the generator set doors to be opened.

In addition, the container has been fitted with a smoke outlet with rain and bird grilles and an air inlet on the other side, also with two grilles. The container is insulated and hermetically sealed.

instalación grupo electrógeno en el túnel Renfe
instalación grupo electrógeno en el túnel Renfe
Contact us