Last July 2022 the XV Women’s Hockey World Cup was held between the 1st and 17th of July. The competition was held in Terrassa, the town with the longest tradition of hockey in Catalonia.

An event with international repercussions that held its matches in the Terrassa Olympic Stadium. A stadium that traditionally hosted Terrassa C.F. matches and that was remodelled for the occasion.

The remodelling plan included the installation of a 450Kva generator set on the first floor of the stadium. This generator support was to meet the electrical needs of the stadium in the event of a power loss.

Agresa was the company chosen by Terrassa City Council to carry out this installation. In this case, a 450Kva generator set was chosen to support not only the stadium’s lighting, but also to guarantee hot water for the changing rooms and electrical support for the dozens of journalists who attended the event and the press conferences after the matches.

Here are some photos of the installation of the equipment and the final result.

instalación grupo electrógeno en el túnel Renfe
instalación grupo electrógeno en el túnel Renfe
instalación grupo electrógeno en el túnel Renfe
instalación grupo electrógeno en el túnel Renfe